Coyote Gold Project
One of Australia’s Highest-Grade Gold Projects
Total Mineral Resources (Indicated & Inferred)
(Including underground Resource at Coyote central of 360koz @ 14.6 g/t Gold)
Coyote Project Facts
Black Cat’s 100%-owned Coyote Gold Project is located in the western Tanami gold region of Western Australia.
A high-grade past producer, Coyote hosts a Mineral Resource of 645koz of gold @ 5.5 g/t Au, including an underground Resource of 360koz of gold @ 14.6 g/t Au, making it one of Australia’s highest-grade deposits.
The Coyote Gold Project is currently in Care & Maintenance, preliminary studies identified opportunity for multiple open pits and a subsequent underground operation. The Company is currently advancing these studies ahead of planned development in 2027-2028. Coyote has all the key pieces required to restart operations, including a 300ktpa processing plant (engineering underway for expansion to 700ktpa), 180+ person camp, and all associated supporting infrastructure.
Black Cat has signed a regional Heritage Protection Agreement with the Native Title group, providing an important framework to support activities.
Status
In Development
Ownership
Processing Capacity
Resource
(Including UG Resource of 360koz Gold @ 14.6 g/t Gold)
The Coyote Gold Project is currently in Care & Maintenance status and Black Cat has completed preliminary studies identifying opportunity for multiple open pits and a subsequent underground operation. The Company is currently advancing these studies ahead of planned development in 2027-2028. Coyote has all the key pieces required to restart operations, including a 300ktpa processing plant (engineering underway for expansion to 700ktpa), 180+ person camp, and all associated supporting infrastructure.
Black Cat has signed a regional Heritage Protection Agreement with the Native Title group, providing an important framework to support activities.
History
The Coyote Gold Project is a past-producing, high-grade gold mine which was operational from 2006 – 2013, producing approximately 211koz of gold at 4.9 g/t gold from both open pit and underground sources, averaging approximately 35,000 ounces of gold per year during this period.
The Coyote Gold Project was put on care and maintenance in 2013 and was eventually acquired by Black Cat in 2022.
Black Cat is currently conducting studies to restart production at Coyote from multiple open pits and an underground mine. The Company is targeting 2027-2028 for a potential restart of operations.
Geology and Mineralisation
Coyote is located in the Tanami Goldfields region, within the Killi Killi Formation, part of the Tanami Group. The region is a classic orogenic system, dominated by the crustal scale Tanami Fault. Deposits are generally located along splays off this fault.
Mineralisation is hosted within the axial plane and limbs of antiformal structures, with similar mineralisation controls to the nearby Callie deposit, and more broadly other slate-belt style areas like the Victorian Goldfields.
An extensive paleochannel overlies much of Coyote, including much of the prospective Coyote stratigraphic sequence. The paleochannel varies from 9m – 30m deep. It is therefore considered that drill holes <30m are likely to have been ineffective over much of the area. Furthermore, the Paleoproterozoic rock under the cover has a stripped profile, so gold anomalies are small and low grade.
The Coyote deposit is hosted within a parasitic anticline within the larger folded Coyote sequence. Gold is hosted both within the fold hinge, and the limbs as stratigraphy parallel gold veins. Veins generally range in 1 cm to 10 cm and often form as swarms. Veins frequently display bonanza grades, with underground development face sampling often reporting >1,000 g/t Au across quartz veins and drilling returning grades of 0.80m @ 154.89 g/t Au from 277.5m (CYUG0359) in unmined areas.
While the Northern Territory side of the system has been widely explored, limited exploration has occurred on the Western Australian side, particularly over the last 10 years. Importantly, mineralisation at Coyote remains open along strike, down plunge, and at depth across multiple stratigraphic horizons, providing strong growth potential.
Mining and Processing
The Coyote Gold Project is currently in a drilling and advanced study phase, targeting 2027-2028 for a potential restart. Preliminary studies are highly encouraging with robust financials based on multiple open pits and underground ore sources.
The Coyote processing plant is strategically important being the only gold processing plant within a ~200km radius. An engineering study is currently underway to upgrade the plant which comprises crushing, grinding, gravity separation, and CIL/CIP circuits. The project is supported by a +180 person mining camp, airstrip, borefields and other regionally significant infrastructure.