Kal East Gold Operation
Multiple Producing Mines on Kalgoorlie’s Doorstep
Total Mineral Resources (Indicated & Inferred)
Probable Mineral Reserves
Kal East Project Facts
Black Cat’s 100%-owned Kal East Gold operation is located within 50km of the world class mining centre of Kalgoorlie-Boulder, Western Australia and is accessible by several all-weather roads. Kal East’s close proximity to Kalgoorlie provides easy access to critical infrastructure and services, as well as a skilled, experienced workforce.
Kal East is currently in production using a hub and spoke model centred around the 1.2Mtpa Lakewood processing facility. In September 2025, the Company began developing two new ore sources: the long-life Majestic underground mine, and the Fingals open pit, which are expected to drive organic growth at Kal East for years to come.
Status
In Production
Targeting 60-70kozpa
Ownership
Processing Capacity
Resource
Black Cat’s 100%-owned Kal East Gold Project is located within 50km of the world class mining centre of Kalgoorlie-Boulder, Western Australia and is accessible by several all-weather roads. Kal East’s close proximity to Kalgoorlie provides easy access to critical infrastructure and services, as well as a skilled, experienced workforce.
Kal East is currently in production using a hub and spoke model centred around the 1.2Mtpa Lakewood processing facility and the Myhree open pit. In September of 2025, the Company has began developing two new ore sources: the long-life Majestic underground mine, and the Fingals open pit, which are expected to drive organic growth at Kal East for years to come.
History
The East of Kalgoorlie has had a history of unconsolidated ownership and small-scale, high-grade production dating back to the turn of the 20th century. Black Cat listed with an initial foothold in 2018, steadily consolidating the project during 2020 and 2021, with multiple transactions completed to acquire eight projects.
Exploration drilling and economic studies at Kal East took place from 2018 to mid 2022 as the Company built a Resource base and derisked the project. In 2022, the Company announced a JORC-certified Mineral Resource Estimate of approximately 18.8 million tonnes @ 2.1 g/t Au, for approximately 1.3 million ounces of gold.
The Company began mining and stockpiling ore in July 2024 from the Myhree deposit and had its first gold pour two months later.
On March 31, 2025 the Company acquired the 1.2Mtpa Lakewood processing facility for A$85M. Lakewood was a strategic acquisition, which has set the basis for the project’s current hub and spoke mining and processing model.
During FY2026, mining activities were completed at the Myhree and Boundary open pits while development activities accelerated at both the Fingals Open Pit and Majestic Underground Mine.
These projects are expected to be the primary contributors to future ore supply for the Lakewood Processing Facility.
Kal East Operations
A growing portfolio of high-grade Western Australian gold projects.
Lakewood
- 1.2Mtpa CIL processing plant (1.5Mtpa expansion study underway)
- Central location - grid power, sealed roads & water supply
Majestic
- Underground mining
- Resource open along strike and down dip
Fingals
- Open pit mining with future underground extension
- Resource open in all directions and at depth
Geology and Mineralisation
The Kal East gold project sits within the Kurnalpi Terrane, which is part of the larger Norseman‑Wuiluna Greenstone Belt. This region comprises volcanic and sedimentary rock sequences, with komatiitic volcanics and younger intrusives, and is structurally dominated by the southeast-plunging Bulong Anticline.
Project-scale geology consists of granite-greenstone lithologies that have been metamorphosed to greenschist facies. The Archaean lithologies are cut by Proterozoic dolerite dykes.
The style of mineralisation at Kal East is Archaean orogenic gold. Mineralisation is predominantly narrow-vein gold, hosted in veins ranging from several centimetres to 2m in width within and adjacent to locally important fault zones.
Mining and Processing
Black Cat is using a hub and spoke mining and processing model for Kal East. The Company’s nearby 1.2Mtpa CIL Lakewood processing facility processes ore from multiple pits and high-grade underground mines. The Lakewood facility has grid power and a new Tailings Storage Facility. The Company is currently completing a study to expand the throughput at Lakewood to 1.5Mtpa.
For FY2026, open pit mining contained 29,029oz across 666kt of ore mined at an average grade of 1.4g/t Au, complemented by 4,055oz contained in 84kt of underground ore mined at Majestic at an average grade of 1.5g/t Au.
Ore milled through Lakewood comprised 751kt of Black Cat ore at a head grade of 1.4g/t Au and 91.5% recovery for 31,509oz produced, supplemented by 449kt of third-party ore for a further 24,537oz, taking total Kal East gold production to 56,046oz for the year on sales of 30,451oz.