Paulsens Gold Operation
Strong Production and Resource Growth
Total Mineral Resources (Indicated & Inferred)
Paulsens Project Facts
Black Cat’s 100%-owned Paulsens Gold Operation is located in the Ashburton Basin in the eastern Pilbara region of Western Australia. The operation is approximately 180 km west of the mining town of Paraburdoo.
The project comprises a high-grade underground gold mine, a 450ktpa processing facility, a +128 person mining camp, and all associated supporting infrastructure.
Status
In Production
Ramping up to 50-60kozpa
Ownership
Processing Capacity
Resource
History
The Paulsens Gold Operation has produced over 950,000 ounces of gold doré to date with both production and Mineral Resource continuing to grow.
From the 1970s to today, multiple companies conducted extensive gold and base metals exploration on the property – with much of this historical data recorded digitally in the Black Cat database.
Paulsens was in production for 13 years (2005 – 2017) with 1Moz of gold mined during this period and recovered gold averaging ~70koz gold per year. The mine was placed on care and maintenance by Northern Star in January 2018 and was subsequently acquired by Black Cat in June 2022.
Black Cat restarted production at Paulsens in late 2024 and had its first gold pour in December of that year.
During FY26, following the successful refurbishment and recommencement of mining and processing activities, the operation fully recouped acquisition costs generating substantial operating cashflow.
Geology and Mineralisation
The Paulsens Gold Operation is hosted in the Wyloo dome within the Ashburton Basin. The style of mineralisation at Paulsens is narrow vein orogenic gold. Mineralisation is hosted in quartz-sulphide veins ranging in thickness from a few centimetres to several metres as well as in semi-massive sulphidic shear zones containing milled sulphides (primarily pyrite and chalcopyrite).
Most of the mined ore zone at Paulsens is hosted in veins within a highly-sheared argillic sandstone/siltstone within a broad shear zone that forms a subsidiary structure to the regionally extensive Nanjilgardy Fault system.
A second set of mineralised quartz veins are hosted in tension gash structures within the Paulsens Mine Gabbro, which is a medium grained gabbro/dolerite sill that intrudes the sedimentary succession. This mineralisation style has not been extensively mined historically however is a growing focus for Black Cat and hosts the Gabbro Vein Mineral Resource.
The historically mined portion of the Paulsens deposit is hosted in a shear zone that cuts through the Paulsens Mine Gabbro and offsets the gabbro several 10s to 100s of metres.
Mining and Processing
Production at the Paulsens Gold Operation consists of mechanised development and longhole open stoping along with narrow vein airleg development and stoping to produce high-grade Ore that feeds the 450ktpa CIP/CIL plant, producing gold doré.
The Company produced approximately 35koz gold in 2026 with a focus on optimising mining methodologies and operating efficiencies. The long term aim for Paulsens is to operate at a similar production rate to the long-term average.
Exploration success – Recent drilling programs have identified new high-grade mineralised zones, highlighting the broader potential of the Paulsens mineralised system beyond the historically mined corridors, encouragingly early mining results provide further opportunitie to extend mine life and grow future resources.